|
Moving and Relocation
Warehousing Facilities, Distribution Centers, Parts Departments, and Remote Site
Moving, Relocation, and Consolidation
Moving and Relocation
Often times we are asked if we
provide Moving, Relocation, and Consolidation Services?
The Answer is Yes!
We Dismantle Warehouses, Distribution Centers, Storage
Facilities,
and all types of Material Handling Equipment for customers wanting to:
Moving and Relocating
|
to other sites or newer more
efficient facilities |
Rework and Upgrade Existing
Facility
|
new or existing facilities
brought up to current
customer standards for look and efficiency |
Downsizing and Consolidating
|
reducing size of operations |
Upsizing and Expansion
|
increasing size of Operation |
Moth Balling and Discontinuation
|
storing or disposing of
equipment |
Moving
and Relocation Projects completed recently range from:
- $1
Million Dollar - Automotive Manufacturer - Major Parts
Distribution Center
Move to New Facilities 20 miles from old facility.
- Top 5 Oil
Company Move to Newly Constructed Distribution Center utilizing
existing and newly purchased storage equipment
- Move of
Existing Automotive Parts Supplier (oem) Store Room to new Store Room
area
making room for more manufacturing space
- Automotive
Dealership moves operations from Atlanta Location to new facility
in South Carolina
- Re-work
existing truck parts retailer's warehouse maximizing organization and
increasing
the storage space of the existing parts facility.
*Note: This is a small sampling of recently completed
projects.
See the difference we can make in your move!!
|
From Small Branch type Operations, to Major Distribution Centers, we can provide
the tear down,
move, and reinstallation services for all types of Storage Racking, and
Mezzanines, In Plant Offices,
and Material Handling Equipment.
Services we provide:
| 1. Facilities Drawing
Service |
Often times customers approach us to draw (catalog) their facility to
scale in an AutoCad drawing so they can use it for future planning and
feasibilty analysis.
|
2. Existing Facility
Storage
System
Re-design |
Re-Work / Revamp / Re-assess layout to perform more efficiently
Relocate Existing facility into New Facility
|
3. New Building
Storage
System Design |
Clean Slate (green field approach) to storage system with an open, empty
building whether it be new construction or existing building move in.
Layout and design efficient storage system tailored specifically to the
customers requirement and site specific location.
|
4. Move, Relocate,
and
Consolidate |
Tear down, move, and reinstall existing
storage equipment to
|
5. New Building
Designs
(around the storage system) |
Design a building around the Storage System, creating the most cost, and
operationally efficient building, storage system, maximizing payback,
and return on equity to the owner.
|
Back to Home Page
Copyright Trammell Equipment Co., Inc. 2010
|